国产免费一期二期三期区别,国产AV妓女影视妓女影院,爽爽影院现观看免费,亚洲精品NV久久久久久久久久

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

欧美巨大另类极品videosbest| 中国a级毛片免费观看| 国产精品另类激情久久久免费| 老师黑色丝袜被躁翻了av| 无码无套少妇毛多18p| 亚洲爆乳无码一区二区三区| 国产白袜脚足j棉袜在线观看| 欧美国产成人精品一区二区三区| 欧美性猛交内射兽交老熟妇| 久久久久88色偷偷| 无码av一区二区三区无码| 蜜桃无码av一区二区| 无码熟妇αⅴ人妻又粗又大 | 午夜dj在线观看高清在线| 久久无码高潮喷水| 日本乱偷人妻中文字幕在线| 丰满少妇人妻久久久久久| 超碰最新上传| 色偷偷成人网免费视频男人的天堂 | 国产二区交换配乱婬| 亚洲av无码久久寂寞少妇| 亚洲av无码一区二区三区在线| 日韩精品无码一区二区三区av| 九九综合va免费看| 国产又色又爽又黄刺激视频| 成全影视免费观看大全二| 中文字幕乱码人在线视频1区| 白嫩少妇激情无码| 全部古装a级在线播放| 老子午夜精品无码| 五级黄高潮片90分钟视频 | 精品久久久久久| 日韩国产精品无码一区二区三区| 日本亚洲欧美在线视观看| 国产欧美日韩一区二区三区| 亚洲色成人网站www永久四虎 | 艳妇乳肉豪妇荡乳av无码福利 | 国产免费av片在线观看播放| 激情综合五月| 亚洲成熟女人毛毛耸耸多| 亚洲男人第一无码av网站|