国产免费一期二期三期区别,国产AV妓女影视妓女影院,爽爽影院现观看免费,亚洲精品NV久久久久久久久久

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

国产精品午夜无码av天美传媒| 特黄熟妇丰满人妻无码| 国产又色又爽又黄刺激视频| 中国女人高潮hd| 日本伊人精品一区二区三区| 各种少妇正面着bbw撒尿视频| 天堂中文官网在线| 中文国产成人精品久久不卡| 国语自产精品视频在线看| 欧美老熟妇乱xxxxx| 亚洲第一天堂无码专区| 国产成人精品日本亚洲| 精品一区二区久久久久久久网站| 日本阿v片在线播放免费| 69风韵老熟女口爆吞精| 久久午夜夜伦鲁鲁片免费无码影视 | 美女高潮黄又色高清视频免费| av人摸人人人澡人人超碰妓女 | 最近中文字幕高清中文字幕无| 无码不卡中文字幕av| 国产av日韩a∨亚洲av电影| 超级碰碰色偷偷免费视频| 宅女午夜福利免费视频| 国产95在线 | 亚洲| 亚洲一区二区三区 无码| 乱码午夜-极品国产内射| 无套内谢孕妇毛片免费看看| 西西人体444www大胆无码视频| 男男黄gay片免费网站www | 久久婷婷久久一区二区三区| 国产精品自在在线午夜蜜芽tv在线 | 18岁日韩内射颜射午夜久久成人 | 免费a级毛视频| 国产 亚洲 制服 无码 中文| 国产美女精品一区二区三区| 国产狂喷水潮免费网站www| 少妇高潮太爽了在线观看免费| 在线观看人成视频免费| 久久99精品久久水蜜桃| 一区二区三区国产亚洲网站| 欧美国产成人精品一区二区三区 |