国产免费一期二期三期区别,国产AV妓女影视妓女影院,爽爽影院现观看免费,亚洲精品NV久久久久久久久久

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

www国产亚洲精品久久网站| 精品成人av一区二区三区| 四虎影视永久地址www成人| 黑人巨茎大战俄罗斯美女| 少妇系列之白嫩人妻| 一本色道久久hezyo无码| 精品人妻中文字幕有码在线 | 免费两性的视频网站| 国产福利在线永久视频| 人妻丰满熟妇无码区免费| 精品熟女碰碰人人a久久| 性少妇中国内射xxxx狠干| 伴郎粗大的内捧猛烈进出| 翘臀少妇被扒开屁股日出水爆乳 | 国产午夜福利在线播放| 中国丰满熟妇xxxx性| 久久精品国产精品亚洲毛片| 人人妻人人澡人人爽人人精品浪潮| 国产精品中文久久久久久久| 伊人激情av一区二区三区| 国产免费一区二区三区免费视频| 性少妇中国内射xxxx狠干 | 国产福利在线永久视频| 中文字幕乱码久久午夜| 亚洲成av人片在| 男女裸体影院高潮| 日本精品一区二区三区在线视频| 久久亚洲精品人成综合网| 国产偷国产偷亚洲清高app| 日本japanese少妇高清| 久久久久亚洲av成人人电影 | 国产suv精品一区二区88l| 人妻无码中文专区久久五月婷| 精品久久久久久久久中文字幕| 久久久久久人妻一区二区三区| 精品人妻系列无码一区二区三区 | 日本三级理论久久人妻电影| 久久精品麻豆日日躁夜夜躁| 亚洲午夜久久久影院| 成人乱码一区二区三区av| 最近2019中文字幕一页二页|